Commit Graph
2 Commits
Author SHA1 Message Date
soarqin cc36edecc7 feat(production): include logistics charging in black-box power 2026-10-25 14:23:52 +08:00
soarqin 426cdf8975 feat(production): add shared planner and factory analysis
Add Proto-backed planning, fixed-building analysis, blueprint capture, and facility-specific material and power calculations.

Migrate belt-signal upstream statistics, include review fixes, and document the architecture and manual validation workflow.
2026-10-25 14:23:52 +08:00